Electrical & Construction Works in Korinthos Accommodation Facility
Project Description
Redevelopment Works for the Entrance Area & Other Works
- Trench shaping and placement of 3A crushed material enriched with cement.
- Construction of a 35 m long fence.
- Construction of double & single-leaf galvanized iron entrance door.
- Installation of (4) LED floodlights on 6m masts.
- Supply & installation of underground concrete septic tank cesspool.
- Supply & installation of twin pump assembly.
- Complete electrical & plumbing installation, connection to existing network to enable operation of existing wash containers.
Construction & electromechanical works for the installation of new power line
- Supply & installation of a new NYY 3×120+70+70 mm2 supply cable within plastic pipes in the ground from the location of the new meter to the new central distribution switchboard.
- Supply & installation of a new distribution switchboard.
- Construction of concrete wall for the installation of the new electric energy meter.
- Certification of electricity and issuance of electrical installer’s declaration of responsibility.
- Delivery of all documents required for the increase of the electrical supply to No. 6 (135kVA).
International Organization for Migration, IOM
Accommodation Facility of Korinthos, Peloponnese, Greece
November 2019
(2) months