(24) Double Containers Installation in the Accommodation Facility of Schisto

Project Description

Construction Works

  • Excavations using mechanical means for ground preparation.
  • Construction of reinforced concrete bases of category C20/25 with a length of 3.20m & cross section of 0.3×0.3m.
  • Transportation & placement of (24) double containers on the bases
  • Transportation & repositioning of (4) containers in a new location.
  • Construction & erection of double metal staircase access to the containers.
  • Construction of fencing around the perimeter of the containers.

Electromechanical Works

  • Excavation of trenches using mechanical means for the passage of electrical networks, water supply and sewerage networks.
  • Complete installation of water supply, sewerage and electricity networks.
  • Supply & installation of (1) general distribution switchboard & of (6) container switchboards.
  • Supply & installation of (10) 6m high masts with (2) 13000 lumen led floodlights.
  • Installation of required earthing equipment.
  • Electrical certification of the installation & issue of an electrical installer’s declaration of responsibility.

International Organization for Migration, IOM

Accommodation Facility of Schisto, Attica, Greece

April 2021

(45) days