(24) Double Containers Installation in the Accommodation Facility of Schisto
Project Description
Construction Works
- Excavations using mechanical means for ground preparation.
- Construction of reinforced concrete bases of category C20/25 with a length of 3.20m & cross section of 0.3×0.3m.
- Transportation & placement of (24) double containers on the bases
- Transportation & repositioning of (4) containers in a new location.
- Construction & erection of double metal staircase access to the containers.
- Construction of fencing around the perimeter of the containers.
Electromechanical Works
- Excavation of trenches using mechanical means for the passage of electrical networks, water supply and sewerage networks.
- Complete installation of water supply, sewerage and electricity networks.
- Supply & installation of (1) general distribution switchboard & of (6) container switchboards.
- Supply & installation of (10) 6m high masts with (2) 13000 lumen led floodlights.
- Installation of required earthing equipment.
- Electrical certification of the installation & issue of an electrical installer’s declaration of responsibility.
International Organization for Migration, IOM
Accommodation Facility of Schisto, Attica, Greece
April 2021
(45) days